The Palm Islands are artificial islands in Dubai, United Arab Emirates on which major commercial and residential infrastructure will be constructed. They are being constructed by Nakheel Properties, a property developer in the United Arab Emirates, who hired the Dutch dredging and marine contractor Van Oord, one of the world's specialists in land reclamation. The islands are the Palm Jumeirah, the Palm Jebel Ali and the Palm Deira.
Each settlement will be in the shape of a
The first two islands will comprise approximately 100 million cubic meters of rock and sand. Palm Deira will be composed of approximately 1 billion cubic meters of rock and sand. All materials will be quarried in the UAE. Between the three islands there will be over 100 luxury hotels, exclusive residential beach side villas and apartments, marinas,
The creation of the Palm Jumeirah began in June 2001. Shortly after, the Palm Jebel Ali was announced and reclamation work began. The Palm Deira, which is planned to have a surface area of 46.35 square kilometre. Construction was originally planned to take 10–15 years, but that was before the impact of the global credit crunch hit Dubai.
Construction
The Palm Islands are fat artificial peninsulas constructed of sand dredged from the bottom of the Persian Gulf by the Belgian company Jan De Nul and the Dutch company Van Oord. The sand is sprayed by the dredging ships, which are guided by DGPS, onto the required area in a process known as rainbowing because of the arcs in the air when the sand is sprayed. The outer edge of each Palm's encircling crescent is a large rock breakwater. The breakwater of the Palm Jumeirah has over seven million tons of rock. Each rock was placed individually by a crane, signed off by a diver and given a GPS coordinate.[citation needed] The Jan De Nul Group started working on the Palm Jebel Ali in 2002 and had finished by the end of 2006. The reclamation project for the Palm Jebel Ali includes the creation of a four kilometre long peninsula, protected by a 200 metre wide, seventeen kilometre long circular breakwater. 210,000,000 m3 of rock, sand and limestone were reclaimed (partly originating from the Jebel Ali Entrance Channel dredging works). There are approximately 10,000,000 m3 of rocks in the slope protection works.
No comments:
Post a Comment